[ad_1]
I’m baaaaaaack. Right here with half 2! I left you with a cliffhanger (aka a spot to take a break) with my storage doorways being put in and completely hating the whole lot about them. Choosing up the place we left off, at this level, it’s Might eighth 2021. We began this journey on April nineteenth 2021. Inside these brief few weeks, my contractor Ron and his guys received quite a bit completed. They ripped up the entire entrance yard (as a result of each inch was lined in concrete), eliminated and changed the sewage line and the water line (BORING), ripped up the fence alongside the left aspect of the driveway, ripped out the insides of the steps and patio (all rotted), had the entire space graded away from the home, introduced plumbing and electrical to the entrance yard (outlet and tap to the appropriate of the gate for …